Projects
Aram Enviro Consultancy is committed to providing cutting-edge solutions for industrial water and wastewater management. With a focus on sustainability, efficiency, and compliance, we offer a range of consultancy and engineering services tailored to meet the specific needs of various industries.

Water Use Capacity: 22,000 m³/day.
Conducted a detailed audit across 8 integrated plants in the facility.
Challenges: High water consumption and process inefficiencies.
Solution: Evaluated Existing Water Use Pattern and governed water balance.

Water Use Capacity: 880 m³/day.
Developed a customized O&M plan tailored to the system’s needs.
Challenges: Frequent breakdowns due to inadequate maintenance practices.
Solution: Implemented predictive maintenance techniques and real-time monitoring.

Water Use Capacity: 4500 m³/day.
Designed an efficient and sustainable water treatment plant.
Challenges: High suspended solids and fluctuating water quality.
Solution: Integrated advanced filtration and reverse osmosis (RO) systems.

Effluent Treatment Plant (ETP) Capacity: 250 m³/day.
Conducted extensive treatability trials to determine viable treatment options.
Challenges: Complex effluent characteristics with high COD/BOD levels.
Solution: Implemented advanced chemical treatment combined with biological processes.

Effluent Treatment Plant (ETP) Capacity: 400 m³/day.
Managed the entire project lifecycle, from design to commissioning.
Challenges: Short project timeline and challenging effluent characteristics.
Solution: Deployed a multi-stage treatment approach, combining physical, chemical, and biological processes.

STP Capacity: Upgraded from 800 m³/day to 2,000 m³/day
Retrofitted key components to increase capacity and efficiency
Challenges: Aging infrastructure and non-compliance with revised discharge norms.
Solution: Upgraded from MBBR to MBR System without disturbing the existing plant operation